Skip to main content
INFINITYPOWER

London, UK — delivering across the UK & East Africa

Power without limits.
Engineered end to end.

Infinity Power Group delivers renewable energy and e-mobility projects from first assessment to commissioning — solar, storage and electric fleets, with the technical rigour and commercial structuring that make them bankable.

Solar delivered
1.45 MW
Solar delivered
Storage commissioned
2.15 MWh
Storage commissioned
Point inspection protocol
142
Point inspection protocol
Typical payback
< 3 yrs
Typical payback
Advisory & delivery

How a project gets built

Four capabilities that run from the factory floor to the customs desk to the market. Engage them together or individually.

Vendor & Technical Due Diligence

Independent assessment of manufacturers, factories and equipment before a single unit ships.

  • Factory and supplier audits at source
  • Pre-dispatch inspection of solar modules and BESS
  • Multi-point quality and compliance checks (142-point protocol)

EPC Evaluation & Contracting

Competitive tendering and contract structuring that protects the client and fixes the price.

  • Comparative analysis of competing EPC proposals
  • Fixed-price, milestone-linked delivery models
  • Performance guarantees and liquidated-damages cover

Import & Tax Structuring

Structuring the import and tax framework to capture every renewable-energy incentive available.

  • Customs and VAT exemption structuring for renewable equipment
  • Regional duty and incentive mapping
  • Logistics, Incoterms and landed-cost modelling

Go-to-Market & Distribution

Turning a product and a region into a route to market, with the economic case built in.

  • Market entry and channel strategy
  • Total-cost-of-ownership positioning for fleet operators
  • Regulatory and homologation pathway
Savings calculator

Estimate the return on a solar + storage system

Adjust the system size, location and tariff to see indicative generation, bill savings and payback. Then talk to us for a site-specific model.

Estimate your

Energy savings

System type
10 kWp2 MWp
Bill savings
$79,497
Energy generated
401.50 MWh
Simple payback
4.6 yrs
CO₂ avoided / yr
120.5 t
Indicative 25-year savings
$1,788,683

Indicative estimates only. Actual generation and savings depend on site conditions, shading, tariff structure, system design and operating profile. Contact our engineers for a site-specific assessment.

Leadership

The people behind the projects

A small, hands-on team that has sat in the factories, read the contracts and stood in the commissioning yards.

AP

Amar Patel

Co-Founder & Director

Leads origination and commercial structuring across IPG's renewable energy and infrastructure portfolio, with a focus on bankability and long-term returns.

S

Sabareesan

Co-Founder & Director

Drives technical due diligence, EPC evaluation and project delivery — from factory inspection through to commissioning and handover.

SP

Shamal Patel

Co-Founder & Director

Leads e-mobility strategy, supplier partnerships and go-to-market, connecting manufacturers with fleet operators across target regions.

Planning a renewable energy or e-mobility project?

Talk to an engineer, not a call centre. We'll tell you what's viable, what it costs and what it returns.